Client

Iron Mountain logo
11,500-SF

Visitor Center built on top of a former limestone mine

Visitor Center

01 Challenge

Iron Mountain, a data and records management company, has a high-security facility in Boyers, PA, located underground in a converted limestone mine. What originally began as a master planning assignment to analyze space usage evolved into a design project aimed at showcasing the site's prominence and correcting several security, shipping, and receiving issues. 

02 Solution

The solution was a hybrid building built on top of the mine that combined a pre-engineered metal building with traditional steel. In contrast to the underground space, the above-ground space includes glass walls and large floor-to-ceiling windows that encourage natural light. This open interior, along with bright finishes and contemporary furniture, creates a fresh, modern, and professional space. 

Quick Facts

Size 11,500 SF

Location Boyers, PA

Completion Date 2017

From Chain-Link Fence to Magnificent Connector 

There is a walkway connecting the main entrance to the visitor’s center that serves as a backdrop to the entire facility. The walkway space was not reliable protection from the outside elements for Iron Mountain’s employees and visitors as it was covered only by a chain-link fence. It also did not showcase any of Iron Mountain’s history or branding. BHDP was selected to redesign the walkway for more practicality and visual appeal. 

The solution was a new walkway cover with more protective material and an aesthetic look. For this, three different options were created; a low, middle, and high cost; each with a different design and material used. The high-cost walkway was chosen for its unique design that beautifully incorporated Iron Mountain’s brand. It uses perforations to create a pattern of mountains all along the walkway, each one original and hand-drawn. All the drawings were translated into CAD drawings and the original walkway was scanned for a 3D model. The panels use the perforations to create the mountain pattern, which are smaller than the previous siding in order to protect from weather. Since the original structure of the bridge was to remain the same, the sizing of the panels and interlocking pieces had to be perfect to attach them to the poles. There were diagrams of the panel brackets, but they were not needed as all pieces fit perfectly to the pre-drilled holes in the poles during installation. 

The result is an upgraded and beautiful walkway that is a branded experience for Iron Mountain’s 2,000+ employees. It displays Iron Mountain’s history and culture for everyone, both pedestrians walking over it and customers driving in. It truly brings the mountain from the surrounding landscape to Iron Mountain.